Masterclass Chartering logo

Masterclass CharteringCHARTERING TRAINING · NZS

Knowledge base · article

Gencon 94: the clauses that matter most in practice

18.09.2026

Gencon is BIMCO’s general-purpose voyage charter, first issued in 1922 and revised in 1976 and 1994; a 2022 revision exists but the 1994 edition is still the form most dry cargo fixtures are made on. Gencon 94 is short (Part I in box layout, Part II with 19 clauses) and owner-friendly in several places, which is why charterers negotiate rider clauses. This article picks the clauses that decide the money and explains what they do.

Clause 2 – Owners’ responsibility

The owner is liable for loss of or damage to the cargo only if caused by want of due diligence to make the vessel seaworthy, or by the personal act or default of the owner or manager. That is narrower than the Hague-Visby Rules, so cargo interests frequently add a “Clause Paramount” incorporating Hague-Visby. Whether the B/L holder is bound by clause 2 or by the Paramount clause depends on the bill of lading wording.

Clause 4 – Payment of freight

Freight is payable on the intaken quantity, either prepaid on shipment (non-returnable, ship and/or cargo lost or not lost) or on delivery, as ticked in Part I. Prepaid freight is normal in dry bulk; the charterer’s exposure is that the freight is earned once shipped, whatever happens afterwards.

Clause 5 – Loading/discharging

Gencon 94 is written on a FIOST basis: cargo is brought into the holds, loaded, stowed and/or trimmed, tallied, lashed and discharged by the charterers, free of risk and expense to the owners. The owner provides winches and cranes and the power. Stevedore damage is for the charterer’s account but must be notified by the master within 24 hours, otherwise it is waived, a time limit often missed.

Clause 6 – Laytime

The clause offers separate laytime for loading and discharging (6a) or total laytime (6b), each as a number of running days/hours, Sundays and holidays excepted unless used. Time counts from 14:00 if NOR is given up to and including 12:00, and from 06:00 next working day if given during office hours after 12:00. NOR may be given whether in berth or not, whether in free pratique or not, whether customs cleared or not. If the ship is found not ready after NOR, time actually lost until she is ready does not count. Most rider clauses replace this clause with a rate per PWWD SHINC and their own commencement wording; the laytime calculation follows from whichever version survives.

Clause 7 – Demurrage

Demurrage is payable at the rate in Part I per day or pro rata, day by day, and, notably, if not paid within 96 hours of the owner’s demand the owner may give 96 hours’ notice to terminate the charter and claim damages. Gencon 94 provides no despatch; if despatch is wanted it must be added.

Clause 8 – Lien

The owner has a lien on the cargo and sub-freights for freight, deadfreight, demurrage and damages for detention. The lien is only as good as the ability to exercise it at the discharge port; local law decides whether cargo can actually be held.

Clause 9 – Cancelling

If the ship is not ready to load on the cancelling date, the charterer may cancel. But the owner who expects to be late must notify the charterer with an expected readiness date and ask whether the charterer will cancel; the charterer must answer within 48 running hours, and if it does not, the cancelling date is moved to seven days after the new readiness date. This “interpellation” mechanism protects the owner and is one reason to read the laycan clause together with clause 9.

Clauses 12, 15, 16 – General average, agency, strikes

General average is adjusted in London under the York-Antwerp Rules 1994 unless otherwise agreed (rider clauses often update the year). The owner appoints its own agent at both ends. The strike clause gives both parties options if strikes delay loading or discharging, with half demurrage payable for strike time after laytime has run at the discharge port.

Clause 19 – Law and arbitration

The parties tick English law and London arbitration, US law and New York arbitration, or another place; if nothing is ticked, English law and London apply. The choice governs how every other clause is read. Small claims procedures (LMAA) make London arbitration workable even for modest demurrage claims.

Rider clauses: where the real deal lives

Few Gencon 94 fixtures are done on the printed form alone. The rider usually carries the load and discharge rates, MOLOO, the berth clause (1 SB 1 SP), hold cleanliness, a Clause Paramount, bunker or war risk clauses, and a time bar for claims. Rider clauses prevail over the printed text when they conflict, and “sub details” in a negotiation is precisely about agreeing that rider. The legal subject of the Masterclass Chartering works through a full Gencon charter party with its rider, clause by clause.

Frequently asked questions

Is Gencon 94 still used?

Yes. Although BIMCO published Gencon 2022, the 1994 edition remains the form most dry cargo voyage charters are based on, with rider clauses.

Does Gencon 94 include despatch?

No. Clause 7 provides for demurrage only; despatch has to be added in a rider clause if the parties want it.

What is the difference between Gencon 94 and NYPE?

Gencon is a voyage charter (freight per tonne, laytime and demurrage); NYPE is a time charter (hire per day, charterer pays bunkers and port costs).

What law applies to a Gencon 94 charter?

Whatever the parties tick in clause 19; if nothing is ticked, English law with arbitration in London.

Not sure which format fits?

Tell us your role. We'll advise within one working day.