Before a ship is fixed, someone has done the sum. The voyage estimate turns a cargo enquiry into a number: what does this voyage earn per day, and is that better than the alternatives? It is the tool of the owner deciding whether to accept a freight, and of the charterer deciding what freight is reasonable. This article shows the building blocks and a simplified example.
The building blocks
Distance and days at sea. Ballast leg from the ship’s current position to the loading port, laden leg to the discharging port, divided by speed, with a margin for weather and a decision on eco versus full speed.
Days in port. From the cargo quantity and the agreed load and discharge rates, plus waiting and turn time. Underestimating port days is the most common error in estimates.
Bunkers. Consumption per day at sea and in port, at the price where bunkers will be taken, for the fuel grades required by the route (ECA zones require low-sulphur fuel).
Port costs and canal dues. Disbursement estimates from agents, canal transit fees, pilotage, tugs, agency.
Commissions. Brokerage and address commission, typically 2.5% to 5% of freight, deducted from income.
Cargo quantity. Limited by deadweight, cubic capacity and stowage factor, draught at the ports and any seasonal load line. The MOLOO wording decides who chooses the quantity.
A simplified example
Supramax, 55,000 tonnes of grain, US Gulf to Rotterdam. Freight USD 28 per tonne. Ballast 3 days, laden 16 days, port 4 + 4 days: 27 days in total. Bunkers: 20 days at sea × 28 tonnes × USD 550 = USD 308,000; port 8 days × 3 tonnes × USD 550 = USD 13,200. Port costs and canal: USD 180,000. Commission 3.75%.
| Item | USD |
|---|---|
| Gross freight 55,000 × 28 | 1,540,000 |
| Commission 3.75% | −57,750 |
| Bunkers | −321,200 |
| Port costs | −180,000 |
| Net voyage result | 981,050 |
| Time charter equivalent (÷ 27 days) | 36,335 per day |
The time charter equivalent (TCE) of about USD 36,000 per day is what this voyage yields compared with simply time-chartering the ship out. If the market for a Supramax time charter is USD 30,000 per day, the voyage is attractive; if it is USD 40,000, the owner should ask for a higher freight or fix something else.
Sensitivity: where the estimate goes wrong
Two extra port days in this example cost about USD 3,000 in bunkers and, more importantly, reduce the TCE to roughly USD 33,800, unless the charterer pays demurrage. A USD 50 per tonne rise in bunker prices costs USD 29,000. A 5% shortfall in cargo quantity costs USD 77,000 in freight. Good estimators therefore vary the three big assumptions (port days, bunker price, cargo quantity) before they fix, and negotiate the clauses that protect them: load rate, demurrage, MOLOO, bunker clauses.
The charterer’s estimate
The charterer does the same calculation from the other side, to test whether the freight offered is fair and to compare a voyage fixture with taking a ship on time charter and running the voyage itself. That comparison, freight versus hire plus voyage costs, is the daily bread of an operator’s desk and is covered in the financial subject of the Masterclass Chartering.
Frequently asked questions
What is a time charter equivalent (TCE)?
The net voyage result (freight minus voyage costs and commissions) divided by the voyage duration in days. It makes voyage fixtures comparable with time charter rates.
Which costs are in a voyage estimate?
Bunkers, port costs and canal dues, commissions, and sometimes cargo-related costs such as hold cleaning. Crew, insurance and maintenance are fixed operating costs and are not part of the voyage estimate.
Why are port days so important?
Because every extra day in port reduces the daily earnings of the whole voyage. The load and discharge rates and the demurrage clause protect the owner against that risk.
Where can I learn voyage estimation?
The online Masterclass Chartering and the Rotterdam edition both include voyage estimation exercises on real fixtures.